TMG Consultancies · Building Regulations

Technical packages and submissions that pass building control first time.

We produce the technical packages that take a scheme from planning approval to building regulations approval — the drawings and specification a builder prices and builds from.

What the service covers

  • —Full plans building regulations submissions
  • —Technical drawings and construction specifications
  • —Building control liaison and query responses
  • —Compliance advice on structure, fire, ventilation and insulation
  • —Regularisation certificates for unauthorised works
  • —Coordination with structural calculations and services

How a project typically runs

  1. 01

    Review of the scheme

    We check the approved plans and flag anything that will not pass building control.

  2. 02

    Technical drawings

    We produce the detailed construction drawings for the submission.

  3. 03

    Specification

    We set out materials and standards so the builder prices accurately.

  4. 04

    Submission

    We lodge the application with building control and manage their questions.

  5. 05

    Approval and site stages

    We confirm the approval and support the inspection stages during the build.

Before you get in touch

Having these to hand helps us give you a useful answer on the first call.

  • ✓Your planning approval or application reference
  • ✓Architectural drawings of the scheme
  • ✓Your builder's details if appointed
  • ✓Your target start date on site
  • ✓Any specialist reports — drainage, trees, flood, acoustics

Next step

Talk it through with us.

Send us the details and we'll come back with how we'd approach it.

Enquire about building regulations

Also in this practice